P-Wave
Customer login
Contact us
Back to case studies
Waste-to-energyXi'an, China

Replacing four soot blowers

Same efficiency, much lower cost

A compact P-Wave installation in existing ports replaced four soot blowers, delivering the same cleaning efficiency at much-reduced operating and maintenance cost.

More case studies
Waste-to-energy

Lausanne, Switzerland

Stable temperatures, no manual campaigns

660 MW coal power plant

Paiton, Indonesia

−10 °C back-pass · −13,000 t coal/yr

Interested in P-Wave for your boiler?

Talk to our team about your configuration and cleaning requirements.

Contact us