Replacing manual explosion cleaning

Stable temperatures, no manual campaigns

Two P-Wave generators have run on Line 2 since August 2022, tuned to 350 bar in front of superheaters 3 & 4. The plant maintains a stable boiler-outlet temperature without organising manual explosion-cleaning campaigns.