← Back to case studiesContact us
660 MW coal power plantPaiton, Indonesia
Lower back-pass temperature and coal savings
−10 °C back-pass · −13,000 t coal/yr
Four P-Wave generators run in the economizer section since August 2022, operating once per hour at 600–750 bar. The plant reduced back-pass temperature by 10 °C and soot-blower operation by 67%, with a follow-up order placed for boiler #60.
Interested in P-Wave for your boiler?
Talk to our team about your configuration and cleaning requirements.