← Back to newsPublished June 2, 2026 Contact us
Case study: fewer shutdowns at a waste-to-energy plant
Replacing manual explosion cleaning with P-Wave generators extended outage intervals.
The challenge
A waste-to-energy plant faced frequent unplanned shutdowns due to boiler clogging and the cost of organising manual explosion cleaning campaigns.
The result
After installing P-Wave generators on existing access doors, the plant saw reduced flue gas temperatures, more stable operation and extended outage intervals — with a fast payback.
Interested in P-Wave for your boiler?
Talk to our team about your configuration and cleaning requirements.